Wind Power Project at Rajkot, Gujarat

Renewable energy carbon credit project in State: Gujarat, District: Rajkot, India, registered with Verra (VCS) as VCS1045.

ReNew Wind Energy (Rajkot) Private Limited (RNWERPL), the Project Proponent (PP), is setting up wind power project of 25.2 MW capacity at Villages: Godladha, Madhavipur, Kalasar, Devpara and Madava of Rajkot district in Gujarat. The project consists of installation of 12 Suzlon make wind turbines of 2.1 MW capacity…

Registry record

Registry and IDVerra (VCS) VCS1045
Project typeRenewable energy
MethodologyACM0002
LocationState: Gujarat, District: Rajkot, India
DeveloperReNew Wind Energy (Rajkot) Private Limited (PP)
Registry statusRegistered
Vintage years2022–2032
Credits issued416,338 tCO2e
Credits retired353,953 tCO2e
Credits not yet retired62,385 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Wind Power Project at Rajkot, Gujarat

Is Wind Power Project at Rajkot, Gujarat a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS1045, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Wind Power Project at Rajkot, Gujarat issued?

The registry shows 416,338 credits issued, 353,953 (85%) already retired by buyers and 62,385 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Wind Power Project at Rajkot, Gujarat use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Wind Power Project at Rajkot, Gujarat cover?

The registry record covers vintages 2022–2032. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Wind Power Project at Rajkot, Gujarat avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Wind Power Project at Rajkot, Gujarat?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in India

All carbon credit projects in India