ICN › Carbon credit projects › Uganda

Ishasha 6.6 MW Small Hydropower Project

Renewable energy carbon credit project in South-Western Uganda, Uganda, registered with Verra (VCS) as VCS1286.

The project is a Greenfield project. The project activity is generating electricity from a new hydropower plant, which will be fed into the Uganda grid, displacing electricity generated from the Uganda source mix. In case the project activity was not implemented, the same amount of electricity would be generated from…

Registry record

Registry and IDVerra (VCS) VCS1286
Project typeRenewable energy
MethodologyAMS-I.D.
LocationSouth-Western Uganda, Uganda
DeveloperMultiple Project Proponents
Registry statusRegistered
Vintage years2011–2021
Credits issued80,138 tCO2e
Credits retired71,624 tCO2e
Credits not yet retired8,514 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Ishasha 6.6 MW Small Hydropower Project

Is Ishasha 6.6 MW Small Hydropower Project a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS1286, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Ishasha 6.6 MW Small Hydropower Project issued?

The registry shows 80,138 credits issued, 71,624 (89%) already retired by buyers and 8,514 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Ishasha 6.6 MW Small Hydropower Project use?

AMS-I.D (Grid connected renewable electricity generation (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.

Which vintage years does Ishasha 6.6 MW Small Hydropower Project cover?

The registry record covers vintages 2011–2021. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Ishasha 6.6 MW Small Hydropower Project avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Ishasha 6.6 MW Small Hydropower Project?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.