ICN › Carbon credit projects › Turkey
Murat HEPP
Other types carbon credit project in Adıyaman Province, Turkey, registered with Verra (VCS) as VCS1344.
The project activity consists of the construction of two Greenfield run-of-river hydroelectric power plants (HEPPs): Murat I and Murat II. They will both be located on the Göksu River flowing through Besni, Adýyaman in Turkey’s South-eastern Region.
Registry record
| Registry and ID | Verra (VCS) VCS1344 |
|---|---|
| Project type | Other |
| Methodology | ACM0002 |
| Location | Adıyaman Province, Turkey |
| Developer | Murat HEPP Energy Electricity Generation and Trade |
| Registry status | Registered |
| Vintage years | 2012–2022 |
| Credits issued | 656,937 tCO2e |
| Credits retired | 609,376 tCO2e |
| Credits not yet retired | 47,561 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002
What to check for this type of project
This project reduces or avoids emissions under a registered methodology. Read the methodology and monitoring reports on the registry for how credits were counted.
- Whether the activity would have happened without carbon revenue.
- How the reductions were measured.
Read more: Avoidance vs removal credits · The ICVCM CCP label · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Murat HEPP
Is Murat HEPP a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS1344, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has Murat HEPP issued?
The registry shows 656,937 credits issued, 609,376 (93%) already retired by buyers and 47,561 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Murat HEPP use?
ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.
Which vintage years does Murat HEPP cover?
The registry record covers vintages 2012–2022. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from Murat HEPP avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Murat HEPP?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in Turkey
- Bursa Light Rail System II Phase (VCS1006, Other)
- Saf I Hepp (VCS1372, Other)
- Yaprak Weir and HEPP (VCS1385, Other)
- Yalnizardiç Dam and Berat HEPP (VCS1409, Other)
- Gokgedik 24.882 MWm / 24.266 MWe Runoff river HEPP, Turkey (VCS1459, Other)
- Reis Enerji Grouped HEPP Project (VCS1500, Other)