ICN › Carbon credit projects › Honduras

Babilonia Hydroelectric Project

Renewable energy carbon credit project in Olancho, Honduras, registered with Verra (VCS) as VCS141.

The project consists of a run-of river hydroelectric project with high-pressure tubes that have diameters of 750 and 600 mm and a length of 3,200 meters, a power house and 2.5 km of power transmission lines which are installed along existing roads, connecting the plant to the national grid (to the Electrical power…

Registry record

Registry and IDVerra (VCS) VCS141
Project typeRenewable energy
MethodologyAMS-I.D.
LocationOlancho, Honduras
DeveloperENERGISA S.A.
Registry statusLate to verify
Vintage years2014–2024
Credits issued118,866 tCO2e
Credits retired114,612 tCO2e
Credits not yet retired4,254 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Babilonia Hydroelectric Project

Is Babilonia Hydroelectric Project a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS141, with the registry status "Late to verify". You can check the public record on the registry yourself.

How many carbon credits has Babilonia Hydroelectric Project issued?

The registry shows 118,866 credits issued, 114,612 (96%) already retired by buyers and 4,254 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Babilonia Hydroelectric Project use?

AMS-I.D (Grid connected renewable electricity generation (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.

Which vintage years does Babilonia Hydroelectric Project cover?

The registry record covers vintages 2014–2024. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Babilonia Hydroelectric Project avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Babilonia Hydroelectric Project?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Honduras

All carbon credit projects