ICN › Carbon credit projects › India

Uri II Hydroelectric Project

Renewable energy carbon credit project in Jammu & Kashmir, India, registered with Verra (VCS) as VCS1424.

The Uri II Hydroelectric Project is Greenfield Hydro Power Project located on river Jhelum near village Uri, district Baramullah of J&K state of India. It is a run of the river scheme with a concrete gravity dam, an underground power house and 8.95 km long water conductor system. A maximum gross head of 130 m is…

Registry record

Registry and IDVerra (VCS) VCS1424
Project typeRenewable energy
MethodologyACM0002
LocationJammu & Kashmir, India
DeveloperNHPC Ltd (PP)
Registry statusRegistered
Vintage years2013–2023
Credits issued1,305,089 tCO2e
Credits retired1,205,057 tCO2e
Credits not yet retired100,032 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Uri II Hydroelectric Project

Is Uri II Hydroelectric Project a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS1424, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Uri II Hydroelectric Project issued?

The registry shows 1,305,089 credits issued, 1,205,057 (92%) already retired by buyers and 100,032 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Uri II Hydroelectric Project use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Uri II Hydroelectric Project cover?

The registry record covers vintages 2013–2023. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Uri II Hydroelectric Project avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Uri II Hydroelectric Project?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in India

All carbon credit projects in India