ICN › Carbon credit projects › Colombia
Escuela de Minas Hydroelectric Project
Renewable energy carbon credit project in Antioquia, Colombia, registered with Verra (VCS) as VCS1723.
The Project consists of a run-of-river power plant that will use the water of the Río Negro basin. The main works are located in El Porvenir, Salto Arriba, Rosario and Pozo counties, within the municipality of Marinilla, Department of Antioquia, Colombia. The project will have a total installed capacity of 55 MW with…
Registry record
| Registry and ID | Verra (VCS) VCS1723 |
|---|---|
| Project type | Renewable energy |
| Methodology | ACM0002 |
| Location | Antioquia, Colombia |
| Developer | HIDROELECTRICA DEL ALTO PORCE S.A.S E.S.P |
| Registry status | Registered |
| Vintage years | 2019–2029 |
| Credits issued | 437,200 tCO2e |
| Credits retired | 125,176 tCO2e |
| Credits not yet retired | 312,024 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002
What to check for this type of project
Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.
- Additionality: in many countries large wind and solar plants now pay for themselves, so ask whether carbon revenue was needed to build this one.
- In 2024 the ICVCM decided that the main grid renewable methodologies do not qualify for its Core Carbon Principles label. Check whether that matters for your claim.
- Older vintages from long-running plants are common and cheap. Many buyers prefer recent vintages.
Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Escuela de Minas Hydroelectric Project
Is Escuela de Minas Hydroelectric Project a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS1723, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has Escuela de Minas Hydroelectric Project issued?
The registry shows 437,200 credits issued, 125,176 (29%) already retired by buyers and 312,024 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Escuela de Minas Hydroelectric Project use?
ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.
Which vintage years does Escuela de Minas Hydroelectric Project cover?
The registry record covers vintages 2019–2029. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from Escuela de Minas Hydroelectric Project avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Escuela de Minas Hydroelectric Project?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in Colombia
- Hydroelectric Project El Edén (VCS1068, Renewable energy)
- Hydroelectric Project PCH Luzma (VCS1364, Renewable energy)
- El Molino-San Matias hydroelectric projects (VCS1797, Renewable energy)
- Hydroelectric projects at Oibita River (VCS1798, Renewable energy)
- Suba and Usaquen Hydroelectric Umbrella Project (VCS2060, Renewable energy)
- PROYECTO REDD+ PAZCÍFICO SUR (ECO114, Forestry & land use)