ICN › Carbon credit projects › India
Wind Power Project at Theni by Powerica Limited
Renewable energy carbon credit project in Tamil Nadu, India, registered with Verra (VCS) as VCS1830.
Powerica Limited is the largest Genset manufacturer in India. Founded in 1980, it is the project proponent of the wind power project under the Clean Development Mechanism of Kyoto Protocol. Effective utilization of resources has been a guiding factor for Powerica towards conceptualization of a 9.9 MW wind power…
Registry record
| Registry and ID | Verra (VCS) VCS1830 |
|---|---|
| Project type | Renewable energy |
| Methodology | AMS-I.D. |
| Location | Tamil Nadu, India |
| Developer | POWERICA LIMITED (PP) |
| Registry status | Registered |
| Vintage years | 2010–2020 |
| Credits issued | 172,406 tCO2e |
| Credits retired | 147,485 tCO2e |
| Credits not yet retired | 24,921 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D
What to check for this type of project
Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.
- Additionality: in many countries large wind and solar plants now pay for themselves, so ask whether carbon revenue was needed to build this one.
- In 2024 the ICVCM decided that the main grid renewable methodologies do not qualify for its Core Carbon Principles label. Check whether that matters for your claim.
- Older vintages from long-running plants are common and cheap. Many buyers prefer recent vintages.
Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Wind Power Project at Theni by Powerica Limited
Is Wind Power Project at Theni by Powerica Limited a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS1830, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has Wind Power Project at Theni by Powerica Limited issued?
The registry shows 172,406 credits issued, 147,485 (86%) already retired by buyers and 24,921 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Wind Power Project at Theni by Powerica Limited use?
AMS-I.D (Grid connected renewable electricity generation (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.
Which vintage years does Wind Power Project at Theni by Powerica Limited cover?
The registry record covers vintages 2010–2020. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from Wind Power Project at Theni by Powerica Limited avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Wind Power Project at Theni by Powerica Limited?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in India
- 27.65 MW Wind Power Project by NSL Renewable Power Private Limited in Karnataka (UCR150, Renewable energy)
- Ground Mounted Small Scale Solar Power Project by Vinati Organics Limited in Osmanabad… (UCR285, Renewable energy)
- 77.2 MW Bundled Wind Projects in AP, MP and Maharashtra, India (UCR320, Renewable energy)
- Large Scale Solar Power Project in Rajasthan (UCR356, Renewable energy)
- 3MW Solar PV Power Plant by Eaama Estates Private Limited, Vizianagaram (UCR367, Renewable energy)
- 30 MW Solar Power Project TKSPL, Tamil Nadu, India (UCR419, Renewable energy)