ICN › Carbon credit projects › Chile

MSA-1 Hydropower Plant

Renewable energy carbon credit project in Cautín Province, Villarrica, Chile, registered with Verra (VCS) as VCS1945.

MSA-1 Hydropower Plant is a Greenfield electricity generation project activity that consists in two run-off-river power plants which were developed by Araucanía Power S.A.. The nominal capacity of the power plant is 3,00 MW.The project is placed in the Pedregoso and Pichipedregoso river, located near Villarrica…

Registry record

Registry and IDVerra (VCS) VCS1945
Project typeRenewable energy
MethodologyAMS-I.D.
LocationCautín Province, Villarrica, Chile
DeveloperAraucania Power SpA (PP)
Registry statusRegistered
Vintage years2018–2028
Credits issued42,028 tCO2e
Credits retired32,015 tCO2e
Credits not yet retired10,013 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about MSA-1 Hydropower Plant

Is MSA-1 Hydropower Plant a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS1945, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has MSA-1 Hydropower Plant issued?

The registry shows 42,028 credits issued, 32,015 (76%) already retired by buyers and 10,013 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does MSA-1 Hydropower Plant use?

AMS-I.D (Grid connected renewable electricity generation (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.

Which vintage years does MSA-1 Hydropower Plant cover?

The registry record covers vintages 2018–2028. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from MSA-1 Hydropower Plant avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from MSA-1 Hydropower Plant?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.