ICN › Carbon credit projects › China

Jiyuan MSW Landfill Site LFG Recovery to Power Project

Other types carbon credit project in Henan Province, China, registered with Verra (VCS) as VCS2679.

Jiyuan MSW Landfill Site LFG Recovery to Power Project (hereafter referred to as “the project”) is developed by Shanghai BCCY Industry Co., Ltd (hereafter referred to as the project owner). It is located in Jiyuan City MSW landfill site, southwest of Zhicheng Town and northeast of Zaoshuling Village, 10km away from…

Registry record

Registry and IDVerra (VCS) VCS2679
Project typeWaste & wastewater
MethodologyAMS-I.D., AMS-III.G.
LocationHenan Province, China
DeveloperHenan BCCY Environmental Energy CO.,LTD. (PP)
Registry statusRegistered
Vintage years2010–2020
Credits issued158,009 tCO2e
Credits retired0 tCO2e
Credits not yet retired158,009 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D

AMS-III.G: Landfill methane recovery (small scale). The small-scale landfill gas method: methane is captured and flared or used instead of escaping. Other projects using AMS-III.G

What to check for this type of project

These projects capture methane from landfills, manure, wastewater or waste, or stop it forming. Methane warms the planet far more than CO2 over the first decades, so cutting it has a fast effect.

Read more: Avoidance vs removal credits · The ICVCM CCP label · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Jiyuan MSW Landfill Site LFG Recovery to Power Project

Is Jiyuan MSW Landfill Site LFG Recovery to Power Project a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS2679, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Jiyuan MSW Landfill Site LFG Recovery to Power Project issued?

The registry shows 158,009 credits issued, 0 (0%) already retired by buyers and 158,009 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Jiyuan MSW Landfill Site LFG Recovery to Power Project use?

AMS-I.D (Grid connected renewable electricity generation (small scale)); AMS-III.G (Landfill methane recovery (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.

Which vintage years does Jiyuan MSW Landfill Site LFG Recovery to Power Project cover?

The registry record covers vintages 2010–2020. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Jiyuan MSW Landfill Site LFG Recovery to Power Project avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Jiyuan MSW Landfill Site LFG Recovery to Power Project?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in China

All carbon credit projects in China