ICN › Carbon credit projects › China
Huaibin MSW Landfill Site LFG Recovery and Comprehensive Utilization Project
Other types carbon credit project in Henan, China, registered with Verra (VCS) as VCS2728.
Huaibin MSW Landfill Site LFG Recovery and Comprehensive Utilization Project (hereafter referred to as the project) is located in Zhengying Village, Wangjiagang Town, Huaibin County, Xinyang City, Henan Province, P.R. China. The project is invested, constructed and operated by Huaibin BCCY New Power Co., Ltd.. The…
Registry record
| Registry and ID | Verra (VCS) VCS2728 |
|---|---|
| Project type | Waste & wastewater |
| Methodology | ACM0001 |
| Location | Henan, China |
| Developer | Henan BCCY Environmental Energy CO.,LTD. (PP) |
| Registry status | Registered |
| Vintage years | 2020–2030 |
| Credits issued | 118,926 tCO2e |
| Credits retired | 21,485 tCO2e |
| Credits not yet retired | 97,441 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
ACM0001: Flaring or use of landfill gas. Capturing methane from landfills and burning it or using it for energy. Credits come from methane that would otherwise escape to the air. Other projects using ACM0001
What to check for this type of project
These projects capture methane from landfills, manure, wastewater or waste, or stop it forming. Methane warms the planet far more than CO2 over the first decades, so cutting it has a fast effect.
- Whether local law already required the capture. If it did, the credits are not additional.
- How the captured or destroyed gas was metered.
Read more: Avoidance vs removal credits · The ICVCM CCP label · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Huaibin MSW Landfill Site LFG Recovery and Comprehensive Utilization Project
Is Huaibin MSW Landfill Site LFG Recovery and Comprehensive Utilization Project a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS2728, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has Huaibin MSW Landfill Site LFG Recovery and Comprehensive Utilization Project issued?
The registry shows 118,926 credits issued, 21,485 (18%) already retired by buyers and 97,441 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Huaibin MSW Landfill Site LFG Recovery and Comprehensive Utilization Project use?
ACM0001 (Flaring or use of landfill gas). Capturing methane from landfills and burning it or using it for energy. Credits come from methane that would otherwise escape to the air.
Which vintage years does Huaibin MSW Landfill Site LFG Recovery and Comprehensive Utilization Project cover?
The registry record covers vintages 2020–2030. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from Huaibin MSW Landfill Site LFG Recovery and Comprehensive Utilization Project avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Huaibin MSW Landfill Site LFG Recovery and Comprehensive Utilization Project?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in China
- Shandong Laiwu Landfill Gas Recovery and Power Generation Project (VCS2260, Waste & wastewater)
- Hunan Xiangtan Landfill Gas Power Generation Project (VCS2299, Waste & wastewater)
- Zhangjiakou Landfill Gas Power Generation Project (VCS2335, Waste & wastewater)
- Sanya Landfill Gas Power Generation Project (VCS2337, Waste & wastewater)
- Shizaiqian MSW landfill site LFG recovery to power project (VCS2352, Waste & wastewater)
- Qingdao Xiaojianxi Phase II MSW landfill site LFG recovery to power project (VCS2353, Waste & wastewater)