ICN › Carbon credit projects › China
Hubei Hefeng Yanzi Town Baishun Village Taohuashan Hydropower Station
Renewable energy carbon credit project in Hubei Province, China, registered with Verra (VCS) as VCS28.
The proposed project activity involves the construction and operation of a run-of-river diversion type hydropower station, the “Hubei Hefeng Yanzi Town Baishun Village Taohuashan Hydropower Station project”, hereafter referred to as “project” or “proposed project”. The proposed project is located in Baishun Village…
Registry record
| Registry and ID | Verra (VCS) VCS28 |
|---|---|
| Project type | Renewable energy |
| Methodology | ACM0002, AMS-I.D. |
| Location | Hubei Province, China |
| Developer | COzero |
| Registry status | Late to verify |
| Credits issued | 21,647 tCO2e |
| Credits retired | 21,643 tCO2e |
| Credits not yet retired | 4 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002
AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D
What to check for this type of project
Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.
- Additionality: in many countries large wind and solar plants now pay for themselves, so ask whether carbon revenue was needed to build this one.
- In 2024 the ICVCM decided that the main grid renewable methodologies do not qualify for its Core Carbon Principles label. Check whether that matters for your claim.
- Older vintages from long-running plants are common and cheap. Many buyers prefer recent vintages.
Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Hubei Hefeng Yanzi Town Baishun Village Taohuashan Hydropower Station
Is Hubei Hefeng Yanzi Town Baishun Village Taohuashan Hydropower Station a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS28, with the registry status "Late to verify". You can check the public record on the registry yourself.
How many carbon credits has Hubei Hefeng Yanzi Town Baishun Village Taohuashan Hydropower Station issued?
The registry shows 21,647 credits issued, 21,643 (100%) already retired by buyers and 4 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Hubei Hefeng Yanzi Town Baishun Village Taohuashan Hydropower Station use?
ACM0002 (Grid-connected electricity generation from renewable sources); AMS-I.D (Grid connected renewable electricity generation (small scale)). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.
Are credits from Hubei Hefeng Yanzi Town Baishun Village Taohuashan Hydropower Station avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Hubei Hefeng Yanzi Town Baishun Village Taohuashan Hydropower Station?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in China
- Inner Mongolia Yihewusu Phase II 49.5 MW Wind Power Project (VCS1001, Renewable energy)
- Xundian Jinfeng 12.6MW Hydropower Project (VCS1032, Renewable energy)
- Inner Mongolia Keshiketeng County Wutaohai South Wind Farm 49.5 MW Project (VCS1035, Renewable energy)
- Guazhou Beidaqiao No.1 Wind Farm Project in Gansu Province, China (VCS1037, Renewable energy)
- Inner Mongolia Hangjin Yihewusu Wind Power Project (VCS1040, Renewable energy)
- Ziqiang 18MW Hydropower Project in Guizhou Province China (VCS1044, Renewable energy)