ICN › Carbon credit projects › India
Replacement of ICLs with LED lamps in Gujarat, India
Other types carbon credit project in Gujarat, India, registered with Verra (VCS) as VCS3059.
The purpose of this Grouped project “Replacement of ICLs with LED lamps in Gujarat, India” is to reduce fossil-fuel based electricity consumption in the Rural households of Gujarat by introducing more energy efficient LED lamps to replace incandescent lightbulbs (“ICLs”), This would result in reduction in greenhouse…
Registry record
| Registry and ID | Verra (VCS) VCS3059 |
|---|---|
| Project type | Industrial / chemical |
| Methodology | AMS-II.C. |
| Location | Gujarat, India |
| Developer | AGS Carbon Advisory (PP) |
| Registry status | Registered |
| Vintage years | 2022–2032 |
| Credits issued | 94,817 tCO2e |
| Credits retired | 464 tCO2e |
| Credits not yet retired | 94,353 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
AMS-II.C: Demand-side energy efficiency activities for specific technologies. Installing more efficient equipment such as lighting or motors, so less power is used. Other projects using AMS-II.C
What to check for this type of project
Industrial projects cut emissions from factories, for example by destroying industrial gases or recovering waste heat.
- Whether regulation now requires the same change, which would make new credits non-additional.
- The plant's monitoring reports on the registry.
Read more: The ICVCM CCP label · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Replacement of ICLs with LED lamps in Gujarat, India
Is Replacement of ICLs with LED lamps in Gujarat, India a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS3059, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has Replacement of ICLs with LED lamps in Gujarat, India issued?
The registry shows 94,817 credits issued, 464 (0%) already retired by buyers and 94,353 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Replacement of ICLs with LED lamps in Gujarat, India use?
AMS-II.C (Demand-side energy efficiency activities for specific technologies). Installing more efficient equipment such as lighting or motors, so less power is used.
Which vintage years does Replacement of ICLs with LED lamps in Gujarat, India cover?
The registry record covers vintages 2022–2032. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from Replacement of ICLs with LED lamps in Gujarat, India avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Replacement of ICLs with LED lamps in Gujarat, India?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in India
- 50 MW Wind Power Project by Gujarat Fluorochemicals Limited, Gujarat, India (UCR341, Industrial / chemical)
- Solar Power Plant of 5 MW in Rajasthan by Essel Mining and Refex Refrigerants Limited (VCS1026, Industrial / chemical)
- 8 MW bundled wind power project, proposed by Ghodawat Industries (India) Pvt. Ltd. (VCS1069, Industrial / chemical)
- AAC Blocks project by Mohit Industries Limited (VCS1238, Industrial / chemical)
- AAC Block/Panel Manufacturing unit at Krishna, Andhra Pradesh (VCS1342, Industrial / chemical)
- VCS Grouped Project for Renewable Power Generation by Essel Mining and Industries Limited (VCS1497, Industrial / chemical)