ICN › Carbon credit projects › China
Hexian MSW Landfill Site LFG recovery to power project
Other types carbon credit project in Anhui Province, China, registered with Verra (VCS) as VCS3061.
Hexian MSW Landfill Site LFG recovery to power project (hereafter referred to as the project) is located at Hexian MSW landfill site (hereafter referred to as Hexian landfill site), in Hexian County, Maanshan City, Anhui Province,P.R. China. The project is constructed and operated by Hexian BCCY Urban new energy Co…
Registry record
| Registry and ID | Verra (VCS) VCS3061 |
|---|---|
| Project type | Waste & wastewater |
| Methodology | AMS-I.D., AMS-III.G. |
| Location | Anhui Province, China |
| Developer | Henan BCCY Environmental Energy CO.,LTD. (PP) |
| Registry status | Registered |
| Vintage years | 2022–2032 |
| Credits issued | 20,010 tCO2e |
| Credits retired | 0 tCO2e |
| Credits not yet retired | 20,010 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D
AMS-III.G: Landfill methane recovery (small scale). The small-scale landfill gas method: methane is captured and flared or used instead of escaping. Other projects using AMS-III.G
What to check for this type of project
These projects capture methane from landfills, manure, wastewater or waste, or stop it forming. Methane warms the planet far more than CO2 over the first decades, so cutting it has a fast effect.
- Whether local law already required the capture. If it did, the credits are not additional.
- How the captured or destroyed gas was metered.
Read more: Avoidance vs removal credits · The ICVCM CCP label · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Hexian MSW Landfill Site LFG recovery to power project
Is Hexian MSW Landfill Site LFG recovery to power project a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS3061, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has Hexian MSW Landfill Site LFG recovery to power project issued?
The registry shows 20,010 credits issued, 0 (0%) already retired by buyers and 20,010 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Hexian MSW Landfill Site LFG recovery to power project use?
AMS-I.D (Grid connected renewable electricity generation (small scale)); AMS-III.G (Landfill methane recovery (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.
Which vintage years does Hexian MSW Landfill Site LFG recovery to power project cover?
The registry record covers vintages 2022–2032. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from Hexian MSW Landfill Site LFG recovery to power project avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Hexian MSW Landfill Site LFG recovery to power project?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in China
- Shandong Laiwu Landfill Gas Recovery and Power Generation Project (VCS2260, Waste & wastewater)
- Hunan Xiangtan Landfill Gas Power Generation Project (VCS2299, Waste & wastewater)
- Zhangjiakou Landfill Gas Power Generation Project (VCS2335, Waste & wastewater)
- Sanya Landfill Gas Power Generation Project (VCS2337, Waste & wastewater)
- Shizaiqian MSW landfill site LFG recovery to power project (VCS2352, Waste & wastewater)
- Qingdao Xiaojianxi Phase II MSW landfill site LFG recovery to power project (VCS2353, Waste & wastewater)