Huizhou Landfill Gas Power Generation Phase III and IV Project
Other types carbon credit project in Guangdong Province, China, registered with Verra (VCS) as VCS3348.
Huizhou Landfill Gas Power Generation Phase III and IV Project (hereafter referred to as the project) is invested and owned by Shenzhen PhasCon Technologies Co., Ltd. (hereafter referred to as the project owner). The project captures the landfill gas that would have been released to the atmosphere in the absence of…
Registry record
| Registry and ID | Verra (VCS) VCS3348 |
|---|---|
| Project type | Waste & wastewater |
| Methodology | ACM0001 |
| Location | Guangdong Province, China |
| Developer | Shenzhen PhasCon Technologies Co., Ltd. |
| Registry status | Registered |
| Vintage years | 2020–2027 |
| Credits issued | 610,764 tCO2e |
| Credits retired | 145,020 tCO2e |
| Credits not yet retired | 465,744 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
ACM0001: Flaring or use of landfill gas. Capturing methane from landfills and burning it or using it for energy. Credits come from methane that would otherwise escape to the air. Other projects using ACM0001
What to check for this type of project
These projects capture methane from landfills, manure, wastewater or waste, or stop it forming. Methane warms the planet far more than CO2 over the first decades, so cutting it has a fast effect.
- Whether local law already required the capture. If it did, the credits are not additional.
- How the captured or destroyed gas was metered.
Read more: Avoidance vs removal credits · The ICVCM CCP label · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Huizhou Landfill Gas Power Generation Phase III and IV Project
Is Huizhou Landfill Gas Power Generation Phase III and IV Project a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS3348, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has Huizhou Landfill Gas Power Generation Phase III and IV Project issued?
The registry shows 610,764 credits issued, 145,020 (24%) already retired by buyers and 465,744 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Huizhou Landfill Gas Power Generation Phase III and IV Project use?
ACM0001 (Flaring or use of landfill gas). Capturing methane from landfills and burning it or using it for energy. Credits come from methane that would otherwise escape to the air.
Which vintage years does Huizhou Landfill Gas Power Generation Phase III and IV Project cover?
The registry record covers vintages 2020–2027. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from Huizhou Landfill Gas Power Generation Phase III and IV Project avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Huizhou Landfill Gas Power Generation Phase III and IV Project?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in China
- Shandong Laiwu Landfill Gas Recovery and Power Generation Project (VCS2260, Waste & wastewater)
- Hunan Xiangtan Landfill Gas Power Generation Project (VCS2299, Waste & wastewater)
- Zhangjiakou Landfill Gas Power Generation Project (VCS2335, Waste & wastewater)
- Sanya Landfill Gas Power Generation Project (VCS2337, Waste & wastewater)
- Shizaiqian MSW landfill site LFG recovery to power project (VCS2352, Waste & wastewater)
- Qingdao Xiaojianxi Phase II MSW landfill site LFG recovery to power project (VCS2353, Waste & wastewater)