ICN › Carbon credit projects › Taiwan
Hsikou Hydro Power Project
Renewable energy carbon credit project in Taiwan, registered with Verra (VCS) as VCS342.
The project activity involves the development of a 11.52 MW (installed capacity) grid connected run-of-river hydropower plant. It produces electricity by utilizing downstream flow from Zengwen reservoir to Wushantou reservoir at different elevations. The maximum effective capacity of the proposed hydro power plant…
Registry record
| Registry and ID | Verra (VCS) VCS342 |
|---|---|
| Project type | Renewable energy |
| Methodology | AMS-I.D. |
| Location | Taiwan |
| Developer | Chianan Industry Co. Ltd. |
| Registry status | Late to verify |
| Credits issued | 107,659 tCO2e |
| Credits retired | 107,066 tCO2e |
| Credits not yet retired | 593 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D
What to check for this type of project
Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.
- Additionality: in many countries large wind and solar plants now pay for themselves, so ask whether carbon revenue was needed to build this one.
- In 2024 the ICVCM decided that the main grid renewable methodologies do not qualify for its Core Carbon Principles label. Check whether that matters for your claim.
- Older vintages from long-running plants are common and cheap. Many buyers prefer recent vintages.
Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Hsikou Hydro Power Project
Is Hsikou Hydro Power Project a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS342, with the registry status "Late to verify". You can check the public record on the registry yourself.
How many carbon credits has Hsikou Hydro Power Project issued?
The registry shows 107,659 credits issued, 107,066 (99%) already retired by buyers and 593 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Hsikou Hydro Power Project use?
AMS-I.D (Grid connected renewable electricity generation (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.
Are credits from Hsikou Hydro Power Project avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Hsikou Hydro Power Project?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in Taiwan
- Bali Landfill Gas Recovery to Electricity Project (VCS1161, Waste & wastewater)
- Ovid Wind Farm Project (ICR112, Renewable energy)
- 27.65 MW Wind Power Project by NSL Renewable Power Private Limited in Karnataka (UCR150, Renewable energy)
- Ground Mounted Small Scale Solar Power Project by Vinati Organics Limited in Osmanabad… (UCR285, Renewable energy)
- 77.2 MW Bundled Wind Projects in AP, MP and Maharashtra, India (UCR320, Renewable energy)
- Large Scale Solar Power Project in Rajasthan (UCR356, Renewable energy)