ICN › Carbon credit projects › Bangladesh
50 MW (AC) SOLAR PARK AT SUTIAKHALI, GOURIPUR, MYMENSINGH
Renewable energy carbon credit project in Mymensingh, Bangladesh, registered with Verra (VCS) as VCS3545.
50 MW (AC) SOLAR PARK AT SUTIAKHALI, GOURIPUR, MYMENSINGH is to utilize the renewable solar energy for electricity generation through the construction of a solar photovoltaic (PV) power plant. The proposed project is located a 170-acre plot of land approximately 7km South East from the town centre of Mymensingh City…
Registry record
| Registry and ID | Verra (VCS) VCS3545 |
|---|---|
| Project type | Renewable energy |
| Methodology | ACM0002 |
| Location | Mymensingh, Bangladesh |
| Developer | HDFC Sinpower Limited (PP) |
| Registry status | Registered |
| Vintage years | 2020–2027 |
| Credits issued | 99,987 tCO2e |
| Credits retired | 0 tCO2e |
| Credits not yet retired | 99,987 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002
What to check for this type of project
Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.
- Additionality: in many countries large wind and solar plants now pay for themselves, so ask whether carbon revenue was needed to build this one.
- In 2024 the ICVCM decided that the main grid renewable methodologies do not qualify for its Core Carbon Principles label. Check whether that matters for your claim.
- Older vintages from long-running plants are common and cheap. Many buyers prefer recent vintages.
Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about 50 MW (AC) SOLAR PARK AT SUTIAKHALI, GOURIPUR, MYMENSINGH
Is 50 MW (AC) SOLAR PARK AT SUTIAKHALI, GOURIPUR, MYMENSINGH a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS3545, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has 50 MW (AC) SOLAR PARK AT SUTIAKHALI, GOURIPUR, MYMENSINGH issued?
The registry shows 99,987 credits issued, 0 (0%) already retired by buyers and 99,987 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does 50 MW (AC) SOLAR PARK AT SUTIAKHALI, GOURIPUR, MYMENSINGH use?
ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.
Which vintage years does 50 MW (AC) SOLAR PARK AT SUTIAKHALI, GOURIPUR, MYMENSINGH cover?
The registry record covers vintages 2020–2027. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from 50 MW (AC) SOLAR PARK AT SUTIAKHALI, GOURIPUR, MYMENSINGH avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from 50 MW (AC) SOLAR PARK AT SUTIAKHALI, GOURIPUR, MYMENSINGH?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in Bangladesh
- Spectra Solar Park Ltd _35 MW AC Grid-Tied by Spectra Solar Park Limited (VCS3099, Renewable energy)
- Grouped Captive Solar Power Project in Bangladesh (VCS4188, Renewable energy)
- Reducing Gas Leakages within the Titas Gas Distribution Network in Bangladesh - CER… (VCS2478, Other)
- Reducing Gas Leakages within the Bakhrabad Gas Distribution Network in Bangladesh (VCS2736, Other)
- Reducing Gas Leakages within the Jalalabad Gas Distribution Network in Bangladesh (VCS2737, Other)
- Reducing Gas Leakages within the Karnaphuli Gas Distribution Network in Bangladesh (VCS2738, Other)