Sulige Natural Gas based Power Generation Project

Renewable energy carbon credit project in Inner Mongolia Autonomous Region, China, registered with Verra (VCS) as VCS368.

The Project is a peak regulation power plant including installation of two sets of 175 MW air-cooling gas steam combined cycle power generation equipments which use natural gas to generate electricity. Annual consumption of natural gas by the Project is 247.8 million Nm3. It is estimated that the feed-in electricity…

Registry record

Registry and IDVerra (VCS) VCS368
Project typeRenewable energy
MethodologyACM0002, AM0029
LocationInner Mongolia Autonomous Region, China
DeveloperSulige Fuel Gas Power Generation Co., Ltd. (PP)
Registry statusLate to verify
Credits issued1,009,236 tCO2e
Credits retired715,630 tCO2e
Credits not yet retired293,606 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

AM0029: Grid connected electricity generation plants using natural gas. Gas-fired power displacing more carbon-intensive grid power such as coal. Other projects using AM0029

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Sulige Natural Gas based Power Generation Project

Is Sulige Natural Gas based Power Generation Project a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS368, with the registry status "Late to verify". You can check the public record on the registry yourself.

How many carbon credits has Sulige Natural Gas based Power Generation Project issued?

The registry shows 1,009,236 credits issued, 715,630 (71%) already retired by buyers and 293,606 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Sulige Natural Gas based Power Generation Project use?

ACM0002 (Grid-connected electricity generation from renewable sources); AM0029 (Grid connected electricity generation plants using natural gas). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Are credits from Sulige Natural Gas based Power Generation Project avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Sulige Natural Gas based Power Generation Project?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in China

All carbon credit projects in China