ICN › Carbon credit projects › India

Capacity enhancement for export of surplus power to grid at Lakshmipuram, Andhra Pradesh, India

Other types carbon credit project in Andhra Pradesh, India, registered with Verra (VCS) as VCS374.

The project activity involves enhancement of the power generation capacity with the installation of a new 3MW turbo generator. The captive energy requirements of the KCP SICL sugar mill are taken care of by the already existing 4.25MW bagasse based cogeneration system. Now that the additional 3MW system is in place…

Registry record

Registry and IDVerra (VCS) VCS374
Project typeIndustrial / chemical
MethodologyACM0006
LocationAndhra Pradesh, India
DeveloperK.C.P SUGAR AND INDUSTRIES CORPORATION LIMITED (PP)
Registry statusLate to verify
Vintage years2006–2016
Credits issued7,335 tCO2e
Credits retired0 tCO2e
Credits not yet retired7,335 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0006: Electricity and heat generation from biomass. Power or heat from biomass residues such as rice husk or bagasse, replacing fossil fuel. Other projects using ACM0006

What to check for this type of project

Industrial projects cut emissions from factories, for example by destroying industrial gases or recovering waste heat.

Read more: The ICVCM CCP label · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Capacity enhancement for export of surplus power to grid at Lakshmipuram…

Is Capacity enhancement for export of surplus power to grid at Lakshmipuram, Andhra Pradesh, India a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS374, with the registry status "Late to verify". You can check the public record on the registry yourself.

How many carbon credits has Capacity enhancement for export of surplus power to grid at Lakshmipuram, Andhra Pradesh, India issued?

The registry shows 7,335 credits issued, 0 (0%) already retired by buyers and 7,335 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Capacity enhancement for export of surplus power to grid at Lakshmipuram, Andhra Pradesh, India use?

ACM0006 (Electricity and heat generation from biomass). Power or heat from biomass residues such as rice husk or bagasse, replacing fossil fuel.

Which vintage years does Capacity enhancement for export of surplus power to grid at Lakshmipuram, Andhra Pradesh, India cover?

The registry record covers vintages 2006–2016. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Capacity enhancement for export of surplus power to grid at Lakshmipuram, Andhra Pradesh, India avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Capacity enhancement for export of surplus power to grid at Lakshmipuram, Andhra Pradesh, India?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in India

All carbon credit projects in India