The Bogeda 40.5 MW Wind-Farm Project in Urumqi, Xinjiang, China

Renewable energy carbon credit project in Xinjiang Uigur Autonomous Region, China, registered with Verra (VCS) as VCS471.

This proposed project is aimed to build a Bogeda 40.5MW wind power farm located within Bogeda area of Tuoli Town of Urumqi County, under the jurisdiction of the Urumqi Municipal, capital of Xinjiang Uigur Autonomous Region of the P.R.C. As the proposed project activity, 27 wind turbines with 1.5MW capacity per unit…

Registry record

Registry and IDVerra (VCS) VCS471
Project typeRenewable energy
MethodologyACM0002
LocationXinjiang Uigur Autonomous Region, China
DeveloperThe CECIC Wind Power (Xinjiang) Co. Ltd.
Registry statusLate to verify
Vintage years2015–2022
Credits issued234,472 tCO2e
Credits retired202,031 tCO2e
Credits not yet retired32,441 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about The Bogeda 40.5 MW Wind-Farm Project in Urumqi, Xinjiang, China

Is The Bogeda 40.5 MW Wind-Farm Project in Urumqi, Xinjiang, China a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS471, with the registry status "Late to verify". You can check the public record on the registry yourself.

How many carbon credits has The Bogeda 40.5 MW Wind-Farm Project in Urumqi, Xinjiang, China issued?

The registry shows 234,472 credits issued, 202,031 (86%) already retired by buyers and 32,441 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does The Bogeda 40.5 MW Wind-Farm Project in Urumqi, Xinjiang, China use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does The Bogeda 40.5 MW Wind-Farm Project in Urumqi, Xinjiang, China cover?

The registry record covers vintages 2015–2022. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from The Bogeda 40.5 MW Wind-Farm Project in Urumqi, Xinjiang, China avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from The Bogeda 40.5 MW Wind-Farm Project in Urumqi, Xinjiang, China?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in China

All carbon credit projects in China