ICN › Carbon credit projects › India

14.1 MW grid connected wind energy project in Tamilnadu by ITC Limited

Renewable energy carbon credit project in Tamil Nadu, India, registered with Verra (VCS) as VCS538.

ITC Ltd, in its packaging and printing facility, has installed 9 numbers of WEGs of total 14.1 MW capacity (4 of 1.65 MW and 5 of 1.5 MW). The main objective of this initiative is to meet the electricity requirement at the packaging and printing facility located at Tiruvottiyur, Chennai, Tamil Nadu in India. The…

Registry record

Registry and IDVerra (VCS) VCS538
Project typeRenewable energy
MethodologyAMS-I.D.
LocationTamil Nadu, India
DeveloperITC Limited (PP)
Registry statusRegistered
Vintage years2008–2018
Credits issued183,740 tCO2e
Credits retired45,037 tCO2e
Credits not yet retired138,703 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about 14.1 MW grid connected wind energy project in Tamilnadu by ITC Limited

Is 14.1 MW grid connected wind energy project in Tamilnadu by ITC Limited a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS538, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has 14.1 MW grid connected wind energy project in Tamilnadu by ITC Limited issued?

The registry shows 183,740 credits issued, 45,037 (25%) already retired by buyers and 138,703 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does 14.1 MW grid connected wind energy project in Tamilnadu by ITC Limited use?

AMS-I.D (Grid connected renewable electricity generation (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.

Which vintage years does 14.1 MW grid connected wind energy project in Tamilnadu by ITC Limited cover?

The registry record covers vintages 2008–2018. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from 14.1 MW grid connected wind energy project in Tamilnadu by ITC Limited avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from 14.1 MW grid connected wind energy project in Tamilnadu by ITC Limited?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in India

All carbon credit projects in India