ICN › Carbon credit projects › China

Yunnan Dehong Longchuan Bienaihe 1st and 2nd Level Hydropower Stations

Renewable energy carbon credit project in Yunnan Province, China, registered with Verra (VCS) as VCS62.

The proposed project is located on the middle and lower reaches of the Bienai River, which is a secondary branch of the Long River that is in Longchuan County, Dehong Dai-Jingpo Autonomous Prefecture, Yunnan Province, China. The project involves the construction and operation of two small-scale run-of-river…

Registry record

Registry and IDVerra (VCS) VCS62
Project typeRenewable energy
MethodologyACM0002, AMS-I.D.
LocationYunnan Province, China
DeveloperLongchuan Minhong Hydro Power Co., Ltd.
Registry statusLate to verify
Vintage years2020–2027
Credits issued41,572 tCO2e
Credits retired40,572 tCO2e
Credits not yet retired1,000 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Yunnan Dehong Longchuan Bienaihe 1st and 2nd Level Hydropower Stations

Is Yunnan Dehong Longchuan Bienaihe 1st and 2nd Level Hydropower Stations a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS62, with the registry status "Late to verify". You can check the public record on the registry yourself.

How many carbon credits has Yunnan Dehong Longchuan Bienaihe 1st and 2nd Level Hydropower Stations issued?

The registry shows 41,572 credits issued, 40,572 (98%) already retired by buyers and 1,000 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Yunnan Dehong Longchuan Bienaihe 1st and 2nd Level Hydropower Stations use?

ACM0002 (Grid-connected electricity generation from renewable sources); AMS-I.D (Grid connected renewable electricity generation (small scale)). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Yunnan Dehong Longchuan Bienaihe 1st and 2nd Level Hydropower Stations cover?

The registry record covers vintages 2020–2027. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Yunnan Dehong Longchuan Bienaihe 1st and 2nd Level Hydropower Stations avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Yunnan Dehong Longchuan Bienaihe 1st and 2nd Level Hydropower Stations?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in China

All carbon credit projects in China