ICN › Carbon credit projects › India
12.55 MW Wind Power Project In India
Other types carbon credit project in Tamilnadu, India, registered with Verra (VCS) as VCS623.
The main purpose of the project activity is to generate clean electricty using wind energy. The project activity consists of a group of wind turbine generators(WTG's) for a total installed capacity of 12.55 MW installed by M/S Walden Properties Private Limited.Approximatly 27395 MW of power generated from the clean…
Registry record
| Registry and ID | Verra (VCS) VCS623 |
|---|---|
| Project type | Renewable energy |
| Methodology | AMS-II.D. |
| Location | Tamilnadu, India |
| Developer | Walden Properties Pvt. Ltd. |
| Registry status | Late to verify |
| Vintage years | 2008–2017 |
| Credits issued | 114,255 tCO2e |
| Credits retired | 111,134 tCO2e |
| Credits not yet retired | 3,121 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
AMS-II.D: Energy efficiency and fuel switching measures for industrial facilities. Making industrial plants use less energy or a lower-carbon fuel.
What to check for this type of project
These projects cut fuel or power use, or switch to a lower-carbon fuel. Credits are avoidance.
- How the before and after energy use was measured.
- Whether the change would have happened anyway for cost reasons.
Read more: Avoidance vs removal credits · The ICVCM CCP label · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about 12.55 MW Wind Power Project In India
Is 12.55 MW Wind Power Project In India a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS623, with the registry status "Late to verify". You can check the public record on the registry yourself.
How many carbon credits has 12.55 MW Wind Power Project In India issued?
The registry shows 114,255 credits issued, 111,134 (97%) already retired by buyers and 3,121 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does 12.55 MW Wind Power Project In India use?
AMS-II.D (Energy efficiency and fuel switching measures for industrial facilities). Making industrial plants use less energy or a lower-carbon fuel.
Which vintage years does 12.55 MW Wind Power Project In India cover?
The registry record covers vintages 2008–2017. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from 12.55 MW Wind Power Project In India avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from 12.55 MW Wind Power Project In India?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in India
- 27.65 MW Wind Power Project by NSL Renewable Power Private Limited in Karnataka (UCR150, Renewable energy)
- Ground Mounted Small Scale Solar Power Project by Vinati Organics Limited in Osmanabad… (UCR285, Renewable energy)
- 77.2 MW Bundled Wind Projects in AP, MP and Maharashtra, India (UCR320, Renewable energy)
- Large Scale Solar Power Project in Rajasthan (UCR356, Renewable energy)
- 3MW Solar PV Power Plant by Eaama Estates Private Limited, Vizianagaram (UCR367, Renewable energy)
- 30 MW Solar Power Project TKSPL, Tamil Nadu, India (UCR419, Renewable energy)