ICN › Carbon credit projects › China

Hubei Lichuan Longqiao Hydropower Station

Renewable energy carbon credit project in Miao Autonomous Prefecture, Hubei Province, China, registered with Verra (VCS) as VCS754.

The project is a newly built hydropower plant, which is located in the upstream of Yu River, Lichuan City, Enshi Tujia and Miao Autonomous Prefecture, Hubei Province, P. R. China. The starting date of the project is 8 September 2005. The total installed capacity of the project is 60 MW (30 MW×2) with expected annual…

Registry record

Registry and IDVerra (VCS) VCS754
Project typeRenewable energy
MethodologyACM0002
LocationMiao Autonomous Prefecture, Hubei Province, China
DeveloperLichuan Yu River Hydropower Co., Ltd.
Registry statusLate to verify
Vintage years2015–2022
Credits issued270,485 tCO2e
Credits retired171,652 tCO2e
Credits not yet retired98,833 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Hubei Lichuan Longqiao Hydropower Station

Is Hubei Lichuan Longqiao Hydropower Station a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS754, with the registry status "Late to verify". You can check the public record on the registry yourself.

How many carbon credits has Hubei Lichuan Longqiao Hydropower Station issued?

The registry shows 270,485 credits issued, 171,652 (63%) already retired by buyers and 98,833 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Hubei Lichuan Longqiao Hydropower Station use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Hubei Lichuan Longqiao Hydropower Station cover?

The registry record covers vintages 2015–2022. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Hubei Lichuan Longqiao Hydropower Station avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Hubei Lichuan Longqiao Hydropower Station?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in China

All carbon credit projects in China