ICN › Carbon credit projects › China

Kaiyuan Yemin 49.5 MW Wind Power Project

Renewable energy carbon credit project in Liaoning Province, China, registered with Verra (VCS) as VCS980.

Kaiyuan Yemin 49.5 MW Wind Power Project (hereafter referred as the proposed project) is located in Yemin Town, Kaiyuan City, Liaoning Province China. It is invested, constructed and operated byKaiyuan Liaoneng Wind Power Co., Ltd.. Totally 33 sets of 1,500 kW wind turbines will be installed, with a total capacity of…

Registry record

Registry and IDVerra (VCS) VCS980
Project typeRenewable energy
MethodologyACM0002
LocationLiaoning Province, China
DeveloperMultiple Project Proponents
Registry statusLate to verify
Vintage years2018–2025
Credits issued96,933 tCO2e
Credits retired72,000 tCO2e
Credits not yet retired24,933 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Kaiyuan Yemin 49.5 MW Wind Power Project

Is Kaiyuan Yemin 49.5 MW Wind Power Project a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS980, with the registry status "Late to verify". You can check the public record on the registry yourself.

How many carbon credits has Kaiyuan Yemin 49.5 MW Wind Power Project issued?

The registry shows 96,933 credits issued, 72,000 (74%) already retired by buyers and 24,933 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Kaiyuan Yemin 49.5 MW Wind Power Project use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Kaiyuan Yemin 49.5 MW Wind Power Project cover?

The registry record covers vintages 2018–2025. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Kaiyuan Yemin 49.5 MW Wind Power Project avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Kaiyuan Yemin 49.5 MW Wind Power Project?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in China

All carbon credit projects in China