Free pilot · CCTS 2026-27 · no sign-in
Refinery target check: how far is each refinery from its 2026-27 CCTS target?
The September 2026 amendment removed the 2025-26 refinery targets, so 2026-27 is the first year that counts. Pick a company, set how much crude you expect to run and how much intensity you expect to have cut, and see the estimated shortfall in tonnes, plant by plant.
The targets ask all 21 refineries for a cut of 1.6% to 5.8% in intensity against 2023-24. A plant that has already cut that much has no shortfall. The link to this page keeps your settings, so you can share it.
Estimate at 2023-24 throughput and no intensity cut since the baseline. This is the upper end; set your own expectations above.
Refineries
21
All refineries with a notified target
Baseline emissions, 2023-24
79.15 Mt
tCO₂e: GEI × throughput × NRGF
Estimated shortfall, 2026-27
2.34 Mt
Certificates to surrender (estimate)
Estimated surplus, 2026-27
0 t
Would be issued as certificates (estimate)
Plant by plant
Each refinery is a separate obligated entity, so one plant's surplus is not netted against another's shortfall here.
| Refinery | Baseline GEI | 2026-27 target | Cut asked | Your GEI | Shortfall (+) / surplus (−) |
|---|---|---|---|---|---|
| Reliance, Jamnagar DTA RefineryGujarat · REFOE020GJ | 4.9877 | 4.8793 | 2.17% | 4.9877 | +2,22,499 t |
| Reliance, Jamnagar SEZ RefineryGujarat · REFOE021GJ | 4.7830 | 4.7079 | 1.57% | 4.7830 | +2,14,537 t |
| Nayara, Vadinar Refinery, JamnagarGujarat · REFOE018GJ | 5.1119 | 4.9477 | 3.21% | 5.1119 | +1,95,917 t |
| MRPL, MangaluruKarnataka · REFOE017KA | 5.7189 | 5.5029 | 3.78% | 5.7189 | +1,91,089 t |
| IndianOil, Haldia RefineryWest Bengal · REFOE013WB | 7.8403 | 7.4518 | 4.96% | 7.8403 | +1,50,580 t |
| IndianOil, Gujarat RefineryGujarat · REFOE011GJ | 5.5541 | 5.3415 | 3.83% | 5.5541 | +1,48,886 t |
| IndianOil, Paradip RefineryOdisha · REFOE016OD | 5.3852 | 5.2279 | 2.92% | 5.3852 | +1,35,649 t |
| HPCL, Visakh RefineryAndhra Pradesh · REFOE006AP | 6.0704 | 5.7970 | 4.50% | 6.0704 | +1,30,541 t |
| HMEL, Guru Gobind Singh Refinery, BathindaPunjab · REFOE007PB | 5.7663 | 5.6135 | 2.65% | 5.7663 | +1,17,091 t |
| BPCL, Bina RefineryMadhya Pradesh · REFOE001MP | 6.6553 | 6.3846 | 4.07% | 6.6553 | +1,15,923 t |
| HPCL, Mumbai RefineryMaharashtra · REFOE005MH | 5.9125 | 5.6549 | 4.36% | 5.9125 | +1,13,277 t |
| CPCL, Manali RefineryTamil Nadu · REFOE004TN | 5.8659 | 5.6635 | 3.45% | 5.8659 | +1,04,149 t |
| IndianOil, Panipat RefineryHaryana · REFOE015HR | 5.6282 | 5.4826 | 2.59% | 5.6282 | +97,318 t |
| BPCL, Kochi RefineryKerala · REFOE002KL | 4.5652 | 4.4583 | 2.34% | 4.5652 | +95,493 t |
| IndianOil, Mathura RefineryUttar Pradesh · REFOE014UP | 5.3245 | 5.1336 | 3.59% | 5.3245 | +74,184 t |
| BPCL, Mumbai RefineryMaharashtra · REFOE003MH | 4.4095 | 4.2843 | 2.84% | 4.4095 | +72,895 t |
| IndianOil, Barauni RefineryBihar · REFOE008BR | 5.8350 | 5.6485 | 3.20% | 5.8350 | +55,988 t |
| IndianOil, Bongaigaon RefineryAssam · REFOE009AS | 7.9764 | 7.6355 | 4.27% | 7.9764 | +46,237 t |
| IndianOil, Guwahati RefineryAssam · REFOE012AS | 9.1348 | 8.6049 | 5.80% | 9.1348 | +22,703 t |
| NRL, Numaligarh Refinery LtdAssam · REFOE019AS | 5.4854 | 5.3324 | 2.79% | 5.4854 | +21,559 t |
| IndianOil, Digboi RefineryAssam · REFOE010AS | 7.2409 | 6.8744 | 5.06% | 7.2409 | +13,145 t |
GEI in tCO₂e per MBBLS of crude per NRGF (complexity factor), as notified. Shortfall = (your GEI − target) × 2026-27 throughput × NRGF.
Buy certificates or cut in-house?
Filled in with ICN's working view of the market (24 Nov 2026). No certificate has traded yet, so these are assumptions, not prices. Change any number.
Certificate price (₹ per tCO₂e)
In-house measure (₹ per tCO₂e)
- Shortfall to cover
- 23,39,661 t
- Cost if bought as certificates
- ₹187.2 crore
- Cost if cut in-house
- ₹818.9 crore
- If left uncovered (compensation, 2× price, reported)
- ₹374.3 crore
At these numbers, buying certificates is cheaper by ₹631.7 crore for all 21 refineries. Our view: do every in-house measure that costs less than the certificate price first, and buy certificates for what is left. In-house cuts also lower every later year's gap; bought certificates cover one year.
Where these numbers come from
Published expectations for the first CCC trades: Rs 250-1,500/t (Saur Energy), Rs 400-900/t in phase 1 (Reclimatize), US$10-15/t mentioned at a CII workshop. ICN central case Rs 800/t. Not official; no CCC has traded yet.
ICN working assumptions for Indian refineries, rough ranges for planning only. Replace them with the plant's own marginal abatement cost curve. Energy efficiency and heat integration: Often pays back; do these first. Fuel switch to natural gas, electrified drives: Depends on gas price and plant layout. Green hydrogen in place of grey: About Rs 150/kg premium over grey hydrogen, ~10 kg CO2 saved per kg.
Environmental compensation of 2× the average certificate price for an uncovered shortfall is as reported in published summaries of the rules.
Carbon Credit Certificates trade only on the power exchanges approved for them. ICN does not buy, sell or trade them.
Separate from CCTS
Voluntary carbon credits
Voluntary credits (Verra, Gold Standard and others) do not count towards a CCTS target and cannot be surrendered against a shortfall. They are for voluntary goals beyond compliance, such as a company's own net-zero plan or Scope 3 commitments.
For those goals, ICN sources checked credits directly from Indian project developers, with the registry record and our checks for every project.
Get the plant-level note for your company
A free two-page note: each refinery's target, the gap under three throughput and intensity cases, and what drives it. Built from the notification, no data needed from you.
Source: MoEFCC G.S.R. 794(E), 7 Sep 2026: GHG Emission Intensity Target (Amendment) Rules, 2026 . It replaced the refinery schedule of G.S.R. 25(E) (13 Jan 2026), corrected the values printed for seven IndianOil refineries, and left the 2025-26 column blank.
Baseline year 2023-24; baseline throughput and NRGF factor as printed with each target. These are estimates for planning, not a compliance calculation: the verified 2026-27 GEI decides the actual position. Check figures against the official notification before relying on them.