ICN › Carbon credit projects › Turkey

Umut-I Hydropower Plant, Turkey

Renewable energy carbon credit project in Black Sea region, Turkey, registered with Verra (VCS) as VCS1012.

Umut-I Hydropower Plant, Turkey owned by Nisan Elektromekanik Enerji San. ve Tic. A.S. is a small scale, dam type hydropower project located on the Gokcebayir River, Ordu, Turkey. The main objective of the Project owner is to increase the power generating capacity in Turkey by developing, constructing and operating…

Registry record

Registry and IDVerra (VCS) VCS1012
Project typeRenewable energy
MethodologyAMS-I.D.
LocationBlack Sea region, Turkey
DeveloperRHG Enerturk Enerji Uretim ve Tic. A.S.
Registry statusRegistered
Vintage years2012–2022
Credits issued15,827 tCO2e
Credits retired0 tCO2e
Credits not yet retired15,827 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Umut-I Hydropower Plant, Turkey

Is Umut-I Hydropower Plant, Turkey a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS1012, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Umut-I Hydropower Plant, Turkey issued?

The registry shows 15,827 credits issued, 0 (0%) already retired by buyers and 15,827 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Umut-I Hydropower Plant, Turkey use?

AMS-I.D (Grid connected renewable electricity generation (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.

Which vintage years does Umut-I Hydropower Plant, Turkey cover?

The registry record covers vintages 2012–2022. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Umut-I Hydropower Plant, Turkey avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Umut-I Hydropower Plant, Turkey?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey