ICN › Carbon credit projects › Turkey

Cermikler 25.00 MW Hydroelectric Power Plant Project

Renewable energy carbon credit project in eastern Anatolia region, Turkey, registered with Verra (VCS) as VCS1050.

Cermikler 25.00 MW Hydrolectric Power Plant project is developed by Ovünç Enerji ve Elektrik Uretim Anonim Sirketi as a hydropower dam project located on the Kyzylyrmak river which originates from eastern Anatolia highlands in Þarkýþla town of Sivas province. The project is planned to generate 80.651 GWh of…

Registry record

Registry and IDVerra (VCS) VCS1050
Project typeRenewable energy
MethodologyACM0002
Locationeastern Anatolia region, Turkey
DeveloperCermikler Elektrik Uretim A. S. (PP)
Registry statusRegistered
Vintage years2013–2023
Credits issued237,720 tCO2e
Credits retired91,981 tCO2e
Credits not yet retired145,739 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Cermikler 25.00 MW Hydroelectric Power Plant Project

Is Cermikler 25.00 MW Hydroelectric Power Plant Project a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS1050, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Cermikler 25.00 MW Hydroelectric Power Plant Project issued?

The registry shows 237,720 credits issued, 91,981 (39%) already retired by buyers and 145,739 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Cermikler 25.00 MW Hydroelectric Power Plant Project use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Cermikler 25.00 MW Hydroelectric Power Plant Project cover?

The registry record covers vintages 2013–2023. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Cermikler 25.00 MW Hydroelectric Power Plant Project avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Cermikler 25.00 MW Hydroelectric Power Plant Project?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey