ICN › Carbon credit projects › South Korea
Turu EV Charging Network Project
Other types carbon credit project in Asia, South Korea, registered with Verra (VCS) as VCS4824.
The Turu EV Charging Network Project (hereinafter Project) is proposed for registration under the Verra Verified Carbon Standard (VCS) Standard, Version 4.5, 04 October 2023 (hereinafter Standard) and associated Program Guide, Version 4.4, 29 August 2023 (hereinafter Guide). The Project is a Grouped Project…
Registry record
| Registry and ID | Verra (VCS) VCS4824 |
|---|---|
| Project type | Transport & fuel switch |
| Methodology | VM0038 |
| Location | Asia, South Korea |
| Developer | Multiple Project Proponents |
| Registry status | Registered |
| Vintage years | 2022–2032 |
| Credits issued | 25,418 tCO2e |
| Credits retired | 500 tCO2e |
| Credits not yet retired | 24,918 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
What to check for this type of project
These projects cut fuel or power use, or switch to a lower-carbon fuel. Credits are avoidance.
- How the before and after energy use was measured.
- Whether the change would have happened anyway for cost reasons.
Read more: Avoidance vs removal credits · The ICVCM CCP label · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Turu EV Charging Network Project
Is Turu EV Charging Network Project a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS4824, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has Turu EV Charging Network Project issued?
The registry shows 25,418 credits issued, 500 (2%) already retired by buyers and 24,918 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Turu EV Charging Network Project use?
The registry lists VM0038. The full method is published on the registry.
Which vintage years does Turu EV Charging Network Project cover?
The registry record covers vintages 2022–2032. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from Turu EV Charging Network Project avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Turu EV Charging Network Project?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in South Korea
- Electric Vehicle Charging Programme in Korea (VCS5237, Transport & fuel switch)
- The Hyundai Waste Energy Recovery CO-Generation Project Phase II (VCS1146, Other)
- Yeong Yang 61.5MW Wind Farm Project - CER Conversion (VCS1451, Renewable energy)
- Yeong Yang 61.5 MW Wind Farm Project (VCS600, Renewable energy)
- Hyundai Steel Waste Energy Cogeneration Project (VCS786, Other)
- RIMA Fuel Switch in Bocaiúva (VCS103, Transport & fuel switch)