ICN › Carbon credit projects › South Korea
Yeong Yang 61.5 MW Wind Farm Project
Renewable energy carbon credit project in Gyeongsangbuk-Do, South Korea, registered with Verra (VCS) as VCS600.
The Yeong Yang wind farm project has a capacity of 61.5 MW, comprising 41 wind turbine generators, each with a capacity of 1.5 MW. It will generate approximately 180,749 MWh per year, which will be sold into Korea Power Exchange. The electricity generated will displace electricity from the Korean grid, which is…
Registry record
| Registry and ID | Verra (VCS) VCS600 |
|---|---|
| Project type | Renewable energy |
| Methodology | ACM0002 |
| Location | Gyeongsangbuk-Do, South Korea |
| Developer | Yeong Yang Wind Power Corporation (PP) |
| Registry status | Late to verify |
| Credits issued | 21,517 tCO2e |
| Credits retired | 18,540 tCO2e |
| Credits not yet retired | 2,977 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002
What to check for this type of project
Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.
- Additionality: in many countries large wind and solar plants now pay for themselves, so ask whether carbon revenue was needed to build this one.
- In 2024 the ICVCM decided that the main grid renewable methodologies do not qualify for its Core Carbon Principles label. Check whether that matters for your claim.
- Older vintages from long-running plants are common and cheap. Many buyers prefer recent vintages.
Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Yeong Yang 61.5 MW Wind Farm Project
Is Yeong Yang 61.5 MW Wind Farm Project a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS600, with the registry status "Late to verify". You can check the public record on the registry yourself.
How many carbon credits has Yeong Yang 61.5 MW Wind Farm Project issued?
The registry shows 21,517 credits issued, 18,540 (86%) already retired by buyers and 2,977 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Yeong Yang 61.5 MW Wind Farm Project use?
ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.
Are credits from Yeong Yang 61.5 MW Wind Farm Project avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Yeong Yang 61.5 MW Wind Farm Project?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in South Korea
- Yeong Yang 61.5MW Wind Farm Project - CER Conversion (VCS1451, Renewable energy)
- The Hyundai Waste Energy Recovery CO-Generation Project Phase II (VCS1146, Other)
- Turu EV Charging Network Project (VCS4824, Transport & fuel switch)
- Electric Vehicle Charging Programme in Korea (VCS5237, Transport & fuel switch)
- Hyundai Steel Waste Energy Cogeneration Project (VCS786, Other)
- Ovid Wind Farm Project (ICR112, Renewable energy)