Murat Hydroelectric Power Plant

Renewable energy carbon credit project in Ordu, Turkey, registered with Verra (VCS) as VCS1193.

Murat HEPP is a small scale activity which has an installed capacity of 11.12 MW. The project is located on The Northern region of Turkey and will produce 31.86 GWh electricity annually. This will replace the same amount of electricity which will be generated by the grid dominated with fossil fired power plants. The…

Registry record

Registry and IDVerra (VCS) VCS1193
Project typeRenewable energy
MethodologyAMS-I.D.
LocationOrdu, Turkey
DeveloperElestaş Elektrik Üretim Anonim Şirketi
Registry statusRegistered
Vintage years2014–2024
Credits issued7,667 tCO2e
Credits retired0 tCO2e
Credits not yet retired7,667 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Murat Hydroelectric Power Plant

Is Murat Hydroelectric Power Plant a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS1193, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Murat Hydroelectric Power Plant issued?

The registry shows 7,667 credits issued, 0 (0%) already retired by buyers and 7,667 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Murat Hydroelectric Power Plant use?

AMS-I.D (Grid connected renewable electricity generation (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.

Which vintage years does Murat Hydroelectric Power Plant cover?

The registry record covers vintages 2014–2024. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Murat Hydroelectric Power Plant avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Murat Hydroelectric Power Plant?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey