ICN › Carbon credit projects › Turkey

Diyoban 19.04 MW Hydroelectric Power Plant Project

Renewable energy carbon credit project in Artvin Province, Turkey, registered with Verra (VCS) as VCS1402.

“Diyoban 19,04 MW Hydroelectric Power Plant Project” is developed by Ati Enerji ve Elektrik Uretim Anonim Sirketi / Energy and Electricity Generation Company as a run-off river hydropower plant project located on the Diyoban river originating from north eastern Anatolia highlands in Savsat town of Artvin province in…

Registry record

Registry and IDVerra (VCS) VCS1402
Project typeRenewable energy
MethodologyACM0002
LocationArtvin Province, Turkey
DeveloperAti Energy and Electric Power Generation Company (Ati Enerji ve Elektrik Üretim A.Ş.)
Registry statusRegistered
Vintage years2013–2023
Credits issued32,052 tCO2e
Credits retired6 tCO2e
Credits not yet retired32,046 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Diyoban 19.04 MW Hydroelectric Power Plant Project

Is Diyoban 19.04 MW Hydroelectric Power Plant Project a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS1402, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Diyoban 19.04 MW Hydroelectric Power Plant Project issued?

The registry shows 32,052 credits issued, 6 (0%) already retired by buyers and 32,046 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Diyoban 19.04 MW Hydroelectric Power Plant Project use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Diyoban 19.04 MW Hydroelectric Power Plant Project cover?

The registry record covers vintages 2013–2023. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Diyoban 19.04 MW Hydroelectric Power Plant Project avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Diyoban 19.04 MW Hydroelectric Power Plant Project?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.