ICN › Carbon credit projects › Turkey

Germiyan Wind Power Project, Turkey

Renewable energy carbon credit project in Izmir, Turkey, registered with Verra (VCS) as VCS1438.

The project of Egenda Ege Enerji Üretim A.S. (hereafter referred to as “Egenda”), Germiyan Wind Power Project (hereafter referred to as the “Project” or “Germiyan WPP”), involves installation and operation of 12 MWe wind power plant. In the early stages of the project, installed capacity is determined as 10.8 MWe…

Registry record

Registry and IDVerra (VCS) VCS1438
Project typeRenewable energy
MethodologyACM0002
LocationIzmir, Turkey
DeveloperEGENDA EGE ENERJI URETIM A.S (PP)
Registry statusRegistered
Vintage years2016–2026
Credits issued171,958 tCO2e
Credits retired103,746 tCO2e
Credits not yet retired68,212 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Germiyan Wind Power Project, Turkey

Is Germiyan Wind Power Project, Turkey a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS1438, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Germiyan Wind Power Project, Turkey issued?

The registry shows 171,958 credits issued, 103,746 (60%) already retired by buyers and 68,212 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Germiyan Wind Power Project, Turkey use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Germiyan Wind Power Project, Turkey cover?

The registry record covers vintages 2016–2026. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Germiyan Wind Power Project, Turkey avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Germiyan Wind Power Project, Turkey?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey