ICN › Carbon credit projects › Turkey

Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project

Renewable energy carbon credit project in GIRESUN, Turkey, registered with Verra (VCS) as VCS1741.

Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project is a run-off river hydropower plant project located on Aksu Stream originating from North Anatolia mountains in Giresun province in Black Sea Region of Turkey. It is a grid connected electricity generation from renewable source project. The project…

Registry record

Registry and IDVerra (VCS) VCS1741
Project typeRenewable energy
MethodologyACM0002
LocationGIRESUN, Turkey
DeveloperYUMRUTEPE ENERJI URETIM ANONIM SIRKETI
Registry statusRegistered
Vintage years2016–2026
Credits issued83,856 tCO2e
Credits retired31,489 tCO2e
Credits not yet retired52,367 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project

Is Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS1741, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project issued?

The registry shows 83,856 credits issued, 31,489 (38%) already retired by buyers and 52,367 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project cover?

The registry record covers vintages 2016–2026. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Yumrutepe Regulator and 15.013 MW Hydroelectric Power Plant Project?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey