ICN › Carbon credit projects › Turkey
Koclu Regulator and Hydroelectric Power Plant (Koçlu Regulator & HEPP)
Renewable energy carbon credit project in Giresun Province, Turkey, registered with Verra (VCS) as VCS2094.
Koçlu Regulator & HEPP consists of the construction of a greenfield one weir and one run-of-river hydroelectric power plants located in the Yaglidere river basin, in Turkey’s Eastern Blacksea Region. Total installed capacity of the project will be 35.60 MW. It is estimated that the electricity production of the…
Registry record
| Registry and ID | Verra (VCS) VCS2094 |
|---|---|
| Project type | Renewable energy |
| Methodology | ACM0002 |
| Location | Giresun Province, Turkey |
| Developer | SANKO Enerji Sanayi ve Ticaret A.Ş |
| Registry status | Registered |
| Vintage years | 2024–2034 |
| Credits issued | 451,416 tCO2e |
| Credits retired | 0 tCO2e |
| Credits not yet retired | 451,416 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002
What to check for this type of project
Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.
- Additionality: in many countries large wind and solar plants now pay for themselves, so ask whether carbon revenue was needed to build this one.
- In 2024 the ICVCM decided that the main grid renewable methodologies do not qualify for its Core Carbon Principles label. Check whether that matters for your claim.
- Older vintages from long-running plants are common and cheap. Many buyers prefer recent vintages.
Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Koclu Regulator and Hydroelectric Power Plant (Koçlu Regulator & HEPP)
Is Koclu Regulator and Hydroelectric Power Plant (Koçlu Regulator & HEPP) a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS2094, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has Koclu Regulator and Hydroelectric Power Plant (Koçlu Regulator & HEPP) issued?
The registry shows 451,416 credits issued, 0 (0%) already retired by buyers and 451,416 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Koclu Regulator and Hydroelectric Power Plant (Koçlu Regulator & HEPP) use?
ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.
Which vintage years does Koclu Regulator and Hydroelectric Power Plant (Koçlu Regulator & HEPP) cover?
The registry record covers vintages 2024–2034. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from Koclu Regulator and Hydroelectric Power Plant (Koçlu Regulator & HEPP) avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Koclu Regulator and Hydroelectric Power Plant (Koçlu Regulator & HEPP)?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in Turkey
- Umut-I Hydropower Plant, Turkey (VCS1012, Renewable energy)
- Cermikler 25.00 MW Hydroelectric Power Plant Project (VCS1050, Renewable energy)
- Damlapinar Hydroelectric Power Plant Project (VCS1066, Renewable energy)
- SENA HYDROELECTRIC POWER PLANT (VCS1091, Renewable energy)
- SANIBEY DAM AND HYDROELECTRIC POWER PLANT (VCS1100, Renewable energy)
- KALE HYDROELECTRIC POWER PLANT (VCS1104, Renewable energy)