Kargilik 24 MW Hydropower Plant, Turkey

Renewable energy carbon credit project in Kahramanmaras Province, Turkey, registered with Verra (VCS) as VCS264.

The Kargilik 24 MW Hydropower Plant, Turkey, which is developed by Tektug Elektrik Uretim Anonim Sirketi (hereafter referred to as the project owner) is a run-of-river hydropower project located in Kahramanmaras province, Turkey. It utilizes the gross water head of 150m on the Kesis River to generate and supply…

Registry record

Registry and IDVerra (VCS) VCS264
Project typeRenewable energy
MethodologyACM0002
LocationKahramanmaras Province, Turkey
DeveloperTektuð Elektrik Üretim A.Þ.
Registry statusLate to verify
Vintage years2016–2026
Credits issued415,172 tCO2e
Credits retired262,893 tCO2e
Credits not yet retired152,279 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Kargilik 24 MW Hydropower Plant, Turkey

Is Kargilik 24 MW Hydropower Plant, Turkey a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS264, with the registry status "Late to verify". You can check the public record on the registry yourself.

How many carbon credits has Kargilik 24 MW Hydropower Plant, Turkey issued?

The registry shows 415,172 credits issued, 262,893 (63%) already retired by buyers and 152,279 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Kargilik 24 MW Hydropower Plant, Turkey use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Kargilik 24 MW Hydropower Plant, Turkey cover?

The registry record covers vintages 2016–2026. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Kargilik 24 MW Hydropower Plant, Turkey avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Kargilik 24 MW Hydropower Plant, Turkey?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.