ICN › Carbon credit projects › Turkey

Feke II 69.58 MW Hydroelecrtic Power Plant

Renewable energy carbon credit project in Adana Province, Turkey, registered with Verra (VCS) as VCS534.

Feke II Hydroelectric power plant project is located at the south of Turkey, in the Mediterranean Region, on the Goksu Creek, a main branch of Seyhan River, within the province of Adana, about 9 km southwest of Feke I district. Feke I and Feke II projects were first developed by General Directorate of DSI (State…

Registry record

Registry and IDVerra (VCS) VCS534
Project typeRenewable energy
MethodologyACM0002
LocationAdana Province, Turkey
DeveloperAkenerji Elektrik Uretim A.S
Registry statusRegistered
Vintage years2011–2020
Credits issued553,604 tCO2e
Credits retired281,244 tCO2e
Credits not yet retired272,360 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Feke II 69.58 MW Hydroelecrtic Power Plant

Is Feke II 69.58 MW Hydroelecrtic Power Plant a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS534, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Feke II 69.58 MW Hydroelecrtic Power Plant issued?

The registry shows 553,604 credits issued, 281,244 (51%) already retired by buyers and 272,360 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Feke II 69.58 MW Hydroelecrtic Power Plant use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Feke II 69.58 MW Hydroelecrtic Power Plant cover?

The registry record covers vintages 2011–2020. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Feke II 69.58 MW Hydroelecrtic Power Plant avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Feke II 69.58 MW Hydroelecrtic Power Plant?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey