ICN › Carbon credit projects › Turkey

Uluabat Hydroelectric Power Plant

Renewable energy carbon credit project in Bursa Province, Turkey, registered with Verra (VCS) as VCS536.

Uluabat HEPP and Cinarcik Dam Project is an integrated project located on the lower basin of Orhaneli Creek, one of the major branches of Mustafa Kemalpasa River. It is built within the scope of Emet Orhaneli Project developed by General Directorate of DSI (State Hydraulic Works) for utilizing the water potential in…

Registry record

Registry and IDVerra (VCS) VCS536
Project typeRenewable energy
MethodologyACM0002
LocationBursa Province, Turkey
DeveloperAkenerji Elektrik Uretim A.S
Registry statusRegistered
Vintage years2010–2020
Credits issued1,701,541 tCO2e
Credits retired1,351,613 tCO2e
Credits not yet retired349,928 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Uluabat Hydroelectric Power Plant

Is Uluabat Hydroelectric Power Plant a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS536, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Uluabat Hydroelectric Power Plant issued?

The registry shows 1,701,541 credits issued, 1,351,613 (79%) already retired by buyers and 349,928 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Uluabat Hydroelectric Power Plant use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Uluabat Hydroelectric Power Plant cover?

The registry record covers vintages 2010–2020. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Uluabat Hydroelectric Power Plant avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Uluabat Hydroelectric Power Plant?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey