The Keban 5 MW Hydropower Plant, Turkey, which is developed by Tektug Elektrik Uretim Anonim Sirketi (hereafter referred to as the “project owner”) is a run-of-river hydropower project located in Elazig province, Turkey. It utilizes the water head of the Keban River between elevations 757.84 m and 691.64 m to…

Registry record

Registry and IDVerra (VCS) VCS598
Project typeRenewable energy
MethodologyAMS-I.D.
LocationEastern Anatolia, Turkey
DeveloperTektuð Elektrik Üretim A.Þ.
Registry statusLate to verify
Vintage years2017–2027
Credits issued220,525 tCO2e
Credits retired128,755 tCO2e
Credits not yet retired91,770 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Keban 5 MW Hydropower Plant, Turkey

Is Keban 5 MW Hydropower Plant, Turkey a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS598, with the registry status "Late to verify". You can check the public record on the registry yourself.

How many carbon credits has Keban 5 MW Hydropower Plant, Turkey issued?

The registry shows 220,525 credits issued, 128,755 (58%) already retired by buyers and 91,770 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Keban 5 MW Hydropower Plant, Turkey use?

AMS-I.D (Grid connected renewable electricity generation (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.

Which vintage years does Keban 5 MW Hydropower Plant, Turkey cover?

The registry record covers vintages 2017–2027. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Keban 5 MW Hydropower Plant, Turkey avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Keban 5 MW Hydropower Plant, Turkey?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.