ICN › Carbon credit projects › Turkey

Sirma Run-of-River Hydro Project

Renewable energy carbon credit project in Bozdogan, Turkey, registered with Verra (VCS) as VCS603.

Sirma hydro project is a 5.88 MW (three 1.96 MW units) small-scale run-of-river hydro power plant which is built in Aydin city, Turkey. It started commercial electricity production in 7 June 2009. Produced electricity is being fed into the national grid. The project generates a substantial emission reduction by…

Registry record

Registry and IDVerra (VCS) VCS603
Project typeRenewable energy
MethodologyAMS-I.D.
LocationBozdogan, Turkey
DeveloperElen Enerji Uretimi Sanayi Ticaret A.S. (PP)
Registry statusRegistered
Vintage years2009–2019
Credits issued114,346 tCO2e
Credits retired58,701 tCO2e
Credits not yet retired55,645 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

AMS-I.D: Grid connected renewable electricity generation (small scale). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace. Other projects using AMS-I.D

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Sirma Run-of-River Hydro Project

Is Sirma Run-of-River Hydro Project a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS603, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Sirma Run-of-River Hydro Project issued?

The registry shows 114,346 credits issued, 58,701 (51%) already retired by buyers and 55,645 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Sirma Run-of-River Hydro Project use?

AMS-I.D (Grid connected renewable electricity generation (small scale)). The small-scale version of ACM0002, for renewable plants up to 15 MW. Credits come from the grid power the plant's output is assumed to replace.

Which vintage years does Sirma Run-of-River Hydro Project cover?

The registry record covers vintages 2009–2019. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Sirma Run-of-River Hydro Project avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Sirma Run-of-River Hydro Project?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey