ICN › Carbon credit projects › Turkey
Grid connected electricity generation from renewable sources:Bagisli 29.57 MW Hydroelectric Power Plant Project, Turkey
Renewable energy carbon credit project in Hakkari, Turkey, registered with Verra (VCS) as VCS657.
Ceykar Elektrik Uretim ( CEYKAR, hereafter) is in the phase of installing a mid-scale runoff-river hydropower plant near Zap Suyu creek in Hakkari, Turkey. The project aims the installation of a 29.57 MW runoff-river hydropower electricity plant (HEPP) inTurkey.The objective of the project is to generate electricity…
Registry record
| Registry and ID | Verra (VCS) VCS657 |
|---|---|
| Project type | Renewable energy |
| Methodology | ACM0002 |
| Location | Hakkari, Turkey |
| Developer | Ceykar Elektrik Üretim A.S. |
| Registry status | Late to verify |
| Vintage years | 2019–2029 |
| Credits issued | 90,754 tCO2e |
| Credits retired | 53,490 tCO2e |
| Credits not yet retired | 37,264 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002
What to check for this type of project
Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.
- Additionality: in many countries large wind and solar plants now pay for themselves, so ask whether carbon revenue was needed to build this one.
- In 2024 the ICVCM decided that the main grid renewable methodologies do not qualify for its Core Carbon Principles label. Check whether that matters for your claim.
- Older vintages from long-running plants are common and cheap. Many buyers prefer recent vintages.
Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Grid connected electricity generation from renewable sources:Bagisli 29.57 MW…
Is Grid connected electricity generation from renewable sources:Bagisli 29.57 MW Hydroelectric Power Plant Project, Turkey a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS657, with the registry status "Late to verify". You can check the public record on the registry yourself.
How many carbon credits has Grid connected electricity generation from renewable sources:Bagisli 29.57 MW Hydroelectric Power Plant Project, Turkey issued?
The registry shows 90,754 credits issued, 53,490 (59%) already retired by buyers and 37,264 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Grid connected electricity generation from renewable sources:Bagisli 29.57 MW Hydroelectric Power Plant Project, Turkey use?
ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.
Which vintage years does Grid connected electricity generation from renewable sources:Bagisli 29.57 MW Hydroelectric Power Plant Project, Turkey cover?
The registry record covers vintages 2019–2029. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from Grid connected electricity generation from renewable sources:Bagisli 29.57 MW Hydroelectric Power Plant Project, Turkey avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Grid connected electricity generation from renewable sources:Bagisli 29.57 MW Hydroelectric Power Plant Project, Turkey?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in Turkey
- Umut-I Hydropower Plant, Turkey (VCS1012, Renewable energy)
- Cermikler 25.00 MW Hydroelectric Power Plant Project (VCS1050, Renewable energy)
- Damlapinar Hydroelectric Power Plant Project (VCS1066, Renewable energy)
- SENA HYDROELECTRIC POWER PLANT (VCS1091, Renewable energy)
- SANIBEY DAM AND HYDROELECTRIC POWER PLANT (VCS1100, Renewable energy)
- KALE HYDROELECTRIC POWER PLANT (VCS1104, Renewable energy)