ICN › Carbon credit projects › Turkey

Lamas III-IV 37.3 MW Hydroelectric Power Plant Project, Turkey

Renewable energy carbon credit project in Mersin, Turkey, registered with Verra (VCS) as VCS726.

T.G.T is the owner of the 37 MW Lamas 3 & 4 run river power plant located in Mersin, Turkey. The project has been validated by Bureau Veritas in August 2009 and has been verified in May 2011. The verification period covers from November 2009 to December 2010. The total verified amount of VERs is 49.292 T/CO2 for the…

Registry record

Registry and IDVerra (VCS) VCS726
Project typeRenewable energy
MethodologyACM0002
LocationMersin, Turkey
DeveloperTGT Enerji Üretim ve Tic. A.Ş.
Registry statusRegistered
Vintage years2019–2029
Credits issued403,594 tCO2e
Credits retired402,713 tCO2e
Credits not yet retired881 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about Lamas III-IV 37.3 MW Hydroelectric Power Plant Project, Turkey

Is Lamas III-IV 37.3 MW Hydroelectric Power Plant Project, Turkey a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS726, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has Lamas III-IV 37.3 MW Hydroelectric Power Plant Project, Turkey issued?

The registry shows 403,594 credits issued, 402,713 (100%) already retired by buyers and 881 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does Lamas III-IV 37.3 MW Hydroelectric Power Plant Project, Turkey use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does Lamas III-IV 37.3 MW Hydroelectric Power Plant Project, Turkey cover?

The registry record covers vintages 2019–2029. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from Lamas III-IV 37.3 MW Hydroelectric Power Plant Project, Turkey avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from Lamas III-IV 37.3 MW Hydroelectric Power Plant Project, Turkey?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey