YEDISU 22.71 MW HYDROELECTRIC POWER PLANT PROJECT

Renewable energy carbon credit project in East Anatolia Region, Bingol Province, Turkey, registered with Verra (VCS) as VCS752.

YEDISU hydroelectric power plant is a run-off-river type HEPP consisting of the Yedisu Weir located on a branch of Firat River, the Perisu creek and a powerhouse. To generate electricity, the project shall utilize the 23.5 meter elevation difference between the outlet water level of Ki?? HEPP, which is under…

Registry record

Registry and IDVerra (VCS) VCS752
Project typeRenewable energy
MethodologyACM0002
LocationEast Anatolia Region, Bingol Province, Turkey
DeveloperMultiple Project Proponents
Registry statusRegistered
Vintage years2022–2032
Credits issued256,599 tCO2e
Credits retired0 tCO2e
Credits not yet retired256,599 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about YEDISU 22.71 MW HYDROELECTRIC POWER PLANT PROJECT

Is YEDISU 22.71 MW HYDROELECTRIC POWER PLANT PROJECT a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS752, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has YEDISU 22.71 MW HYDROELECTRIC POWER PLANT PROJECT issued?

The registry shows 256,599 credits issued, 0 (0%) already retired by buyers and 256,599 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does YEDISU 22.71 MW HYDROELECTRIC POWER PLANT PROJECT use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does YEDISU 22.71 MW HYDROELECTRIC POWER PLANT PROJECT cover?

The registry record covers vintages 2022–2032. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from YEDISU 22.71 MW HYDROELECTRIC POWER PLANT PROJECT avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from YEDISU 22.71 MW HYDROELECTRIC POWER PLANT PROJECT?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey