ICN › Carbon credit projects › Turkey

The Cevizlik Run-of-River Hydroelectric Power Plant

Renewable energy carbon credit project in Rize, Turkey, registered with Verra (VCS) as VCS753.

The Cevizlik Hydroelectric Project consists of the construction of a Greenfield 93 MW run-of-river hydroelectric power plant located in the Iyidere river basin, in Turkey’s Eastern Blacksea Region. The plant has been designed to generate electricity by utilizing the 230 m of head between the tailwater level of the…

Registry record

Registry and IDVerra (VCS) VCS753
Project typeRenewable energy
MethodologyACM0002
LocationRize, Turkey
DeveloperSANKO Enerji Sanayi ve Ticaret A.Ş
Registry statusRegistered
Vintage years2020–2030
Credits issued1,962,893 tCO2e
Credits retired802,711 tCO2e
Credits not yet retired1,160,182 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about The Cevizlik Run-of-River Hydroelectric Power Plant

Is The Cevizlik Run-of-River Hydroelectric Power Plant a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS753, with the registry status "Registered". You can check the public record on the registry yourself.

How many carbon credits has The Cevizlik Run-of-River Hydroelectric Power Plant issued?

The registry shows 1,962,893 credits issued, 802,711 (41%) already retired by buyers and 1,160,182 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does The Cevizlik Run-of-River Hydroelectric Power Plant use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does The Cevizlik Run-of-River Hydroelectric Power Plant cover?

The registry record covers vintages 2020–2030. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from The Cevizlik Run-of-River Hydroelectric Power Plant avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from The Cevizlik Run-of-River Hydroelectric Power Plant?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey