ICN › Carbon credit projects › Turkey
Sarigüzel Dam and Hydroelectric Power Plants
Renewable energy carbon credit project in Kahramanmaraş Province in the Eastern Region, Turkey, registered with Verra (VCS) as VCS771.
Sarigüzel Dam and Hydroelectric Power Plants (HEPPs) are located in Kahramanmaras Province, Ilica Town on Ceyhan River.There are two hydroelectric power plants in the proposed project: Sarigüzel Hydroelectric Power Plant with 98.88 MW capacity and Sarigüzel-1 Hydroelectric Power Plant with 3.66 MW capacity. The total…
Registry record
| Registry and ID | Verra (VCS) VCS771 |
|---|---|
| Project type | Renewable energy |
| Methodology | ACM0002 |
| Location | Kahramanmaraş Province in the Eastern Region, Turkey |
| Developer | Enerjisa Enerji Uretim A.S. |
| Registry status | Registered |
| Vintage years | 2023–2033 |
| Credits issued | 110,291 tCO2e |
| Credits retired | 95,083 tCO2e |
| Credits not yet retired | 15,208 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002
What to check for this type of project
Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.
- Additionality: in many countries large wind and solar plants now pay for themselves, so ask whether carbon revenue was needed to build this one.
- In 2024 the ICVCM decided that the main grid renewable methodologies do not qualify for its Core Carbon Principles label. Check whether that matters for your claim.
- Older vintages from long-running plants are common and cheap. Many buyers prefer recent vintages.
Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about Sarigüzel Dam and Hydroelectric Power Plants
Is Sarigüzel Dam and Hydroelectric Power Plants a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS771, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has Sarigüzel Dam and Hydroelectric Power Plants issued?
The registry shows 110,291 credits issued, 95,083 (86%) already retired by buyers and 15,208 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does Sarigüzel Dam and Hydroelectric Power Plants use?
ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.
Which vintage years does Sarigüzel Dam and Hydroelectric Power Plants cover?
The registry record covers vintages 2023–2033. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from Sarigüzel Dam and Hydroelectric Power Plants avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from Sarigüzel Dam and Hydroelectric Power Plants?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in Turkey
- Umut-I Hydropower Plant, Turkey (VCS1012, Renewable energy)
- Cermikler 25.00 MW Hydroelectric Power Plant Project (VCS1050, Renewable energy)
- Damlapinar Hydroelectric Power Plant Project (VCS1066, Renewable energy)
- SENA HYDROELECTRIC POWER PLANT (VCS1091, Renewable energy)
- SANIBEY DAM AND HYDROELECTRIC POWER PLANT (VCS1100, Renewable energy)
- KALE HYDROELECTRIC POWER PLANT (VCS1104, Renewable energy)