ICN › Carbon credit projects › Turkey

YESIL HYDROELECTRIC POWER PLANT (HEPP)

Renewable energy carbon credit project in Sivas, Turkey, registered with Verra (VCS) as VCS806.

The YESİL Hydro Electric Power Plant (HEPP) (hereafter referred to as the “Project”) developed by Yeşilbas Elektrik Üretim AS (hereafter referred to as the “Project Developer”) is a grid-connected smallscale hydropower plant with a run-of-river reservoir in Sivas province, Turkey (hereafter referred to as the “Host…

Registry record

Registry and IDVerra (VCS) VCS806
Project typeRenewable energy
MethodologyACM0002
LocationSivas, Turkey
DeveloperYeşilbas Elektrik Üretim AŞ
Registry statusLate to verify
Vintage years2019–2029
Credits issued35,652 tCO2e
Credits retired35,651 tCO2e
Credits not yet retired1 tCO2e

Issuance figures are from the registry as of 2026-08-31.

View this project on the registry

About the methodology

ACM0002: Grid-connected electricity generation from renewable sources. Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid. Other projects using ACM0002

What to check for this type of project

Renewable energy credits pay for power from wind, solar, hydro or similar plants, counted against the fossil power the grid would otherwise use. They are avoidance credits: they prevent emissions rather than take carbon out of the air.

Read more: The ICVCM CCP label · Carbon credits vs RECs · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works

Buy credits from this project

ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.

Questions about YESIL HYDROELECTRIC POWER PLANT (HEPP)

Is YESIL HYDROELECTRIC POWER PLANT (HEPP) a registered carbon credit project?

Yes. It is on the Verra (VCS) registry as VCS806, with the registry status "Late to verify". You can check the public record on the registry yourself.

How many carbon credits has YESIL HYDROELECTRIC POWER PLANT (HEPP) issued?

The registry shows 35,652 credits issued, 35,651 (100%) already retired by buyers and 1 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.

Which methodology does YESIL HYDROELECTRIC POWER PLANT (HEPP) use?

ACM0002 (Grid-connected electricity generation from renewable sources). Large wind, solar, hydro or geothermal plants that feed the grid. Credits are counted from the fossil power the plant's output is assumed to replace on that grid.

Which vintage years does YESIL HYDROELECTRIC POWER PLANT (HEPP) cover?

The registry record covers vintages 2019–2029. Which vintages are still for sale changes over time, so ask for current stock before you buy.

Are credits from YESIL HYDROELECTRIC POWER PLANT (HEPP) avoidance or removal credits?

ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.

Can my company buy and retire credits from YESIL HYDROELECTRIC POWER PLANT (HEPP)?

ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.

More projects in Turkey

All carbon credit projects in Turkey