BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project
Other types carbon credit project in Aydin, Turkey, registered with Verra (VCS) as VCS816.
The proposed WHR system will efficiently utilize the waste heat from the clinker production process to generate electricity. The project developer plans to install one captive power stations (5.5 MW), based on waste heat recovery. The steam generated from the boilers will be sent to a turbine that feeds a generator…
Registry record
| Registry and ID | Verra (VCS) VCS816 |
|---|---|
| Project type | Industrial / chemical |
| Methodology | ACM0012 |
| Location | Aydin, Turkey |
| Developer | Batısoke Soke Çimento San. T.A.S. |
| Registry status | Registered |
| Vintage years | 2013–2023 |
| Credits issued | 67,780 tCO2e |
| Credits retired | 0 tCO2e |
| Credits not yet retired | 67,780 tCO2e |
Issuance figures are from the registry as of 2026-08-31.
View this project on the registry
About the methodology
ACM0012: Waste energy recovery. Using waste heat or gas from industrial processes to make power, replacing fossil power. Other projects using ACM0012
What to check for this type of project
Industrial projects cut emissions from factories, for example by destroying industrial gases or recovering waste heat.
- Whether regulation now requires the same change, which would make new credits non-additional.
- The plant's monitoring reports on the registry.
Read more: The ICVCM CCP label · Avoidance vs removal credits · What a vintage means · Check an offer is genuine · How retirement works
Buy credits from this project
ICN sources credits for companies, checks them against the registry and retires them in the buyer's name with a public certificate.
Questions about BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project
Is BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project a registered carbon credit project?
Yes. It is on the Verra (VCS) registry as VCS816, with the registry status "Registered". You can check the public record on the registry yourself.
How many carbon credits has BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project issued?
The registry shows 67,780 credits issued, 0 (0%) already retired by buyers and 67,780 not yet retired, as of 2026-08-31. Each credit is one tonne of CO2e.
Which methodology does BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project use?
ACM0012 (Waste energy recovery). Using waste heat or gas from industrial processes to make power, replacing fossil power.
Which vintage years does BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project cover?
The registry record covers vintages 2013–2023. Which vintages are still for sale changes over time, so ask for current stock before you buy.
Are credits from BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project avoidance or removal credits?
ICN does not class this project as a removal, so treat its credits as emission reductions or avoidance. That is normal for most projects and fine for many claims, but net-zero standards ask for removals to balance residual emissions.
Can my company buy and retire credits from BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project?
ICN can ask the seller for a quote. ICN retires the credits on the Verra (VCS) registry in your company's name and gives you a public certificate.
More projects in Turkey
- BATICIM BATI ANADOLU CIMENTO SANAYII A.S. 9 MW Cement WHR Project (VCS822, Industrial / chemical)
- Bursa Light Rail System II Phase (VCS1006, Other)
- Umut-I Hydropower Plant, Turkey (VCS1012, Renewable energy)
- Cermikler 25.00 MW Hydroelectric Power Plant Project (VCS1050, Renewable energy)
- Damlapinar Hydroelectric Power Plant Project (VCS1066, Renewable energy)
- SENA HYDROELECTRIC POWER PLANT (VCS1091, Renewable energy)